Installation can be carried out in two ways: using special pliers, using a screwdriver.
1.Make a hole of the right diameter and depth and clean it.
2.Place the expansion sleeve in the borehole.
3.The attachment is ready to accept the load.
Item No. |
Size |
Working Length |
Box |
Carton |
|
mm |
pcs |
pcs |
|
24001 |
M4X21 |
29±2 |
500 |
5000 |
24002 |
M4X32 |
42±2 |
350 |
3500 |
24003 |
M4X38 |
48±2 |
300 |
3000 |
24004 |
M4X46 |
56±2 |
250 |
2500 |
24005 |
M4X52 |
62±2 |
250 |
2500 |
24006 |
M4X60 |
70±2 |
200 |
2000 |
24007 |
M5X37 |
46±2 |
200 |
2000 |
24008 |
M5X52 |
60±2 |
150 |
1500 |
24009 |
M5X65 |
73±2 |
100 |
1000 |
24010 |
M5X80 |
88±2 |
100 |
1000 |
24011 |
M6X37 |
45±2 |
150 |
1500 |
24012 |
M6X52 |
60±2 |
100 |
1000 |
24013 |
M6X65 |
73±2 |
100 |
1000 |
24014 |
M6X80 |
88±2 |
90 |
900 |
24015 |
M8X37 |
45±2 |
100 |
1000 |
24016 |
M8X52 |
60±2 |
90 |
900 |
24017 |
M8X65 |
73±2 |
80 |
800 |
24018 |
M8X80 |
88±2 |
70 |
700 |
Large stock and quick delivery than every competitor
Strong R&D team and strict QC system ensure the quality, Less than 0.3% product failure rate
Continuous Innovation and research and development, improve process, stabilize product quality and improve production efficiency